Blog

Back to results

06.12.2017 Monet Subsea Cable Ready for Service

The consortium behind the Monet subsea cable system that connects Florida to Brazil has informed that the cable is ready for service.

The consortium consists of Algar Telecom (Brazil), Angola Cables (Angola), Antel (Uruguay), Google and TE SubCom, a TE Connectivity company.

According to TE SubCom, the commercial traffic should be able to start shortly, as the 10,556 km cable is complete and prepared to provide more than 64 Tbps of capacity to users.